Public Transport Planning: When Transit Network Connectivity Meets Commuting Demand

03/30/2021
by   Sheng Wang, et al.
0

In this paper, we make a first attempt to incorporate both commuting demand and transit network connectivity in bus route planning (CT-Bus), and formulate it as a constrained optimization problem: planning a new bus route with k edges over an existing transit network without building new bus stops to maximize a linear aggregation of commuting demand and connectivity of the transit network. We prove the NP-hardness of CT-Bus and propose an expansion-based greedy algorithm that iteratively scans potential candidate paths in the network. To boost the efficiency of computing the connectivity of new networks with candidate paths, we convert it to a matrix trace estimation problem and employ a Lanczos method to estimate the natural connectivity of the transit network with a guaranteed error bound. Furthermore, we derive upper bounds on the objective values and use them to greedily select candidates for expansion. Our experiments conducted on real-world transit networks in New York City and Chicago verify the efficiency, effectiveness, and scalability of our algorithms.

READ FULL TEXT

Please sign up or login with your details

Forgot password? Click here to reset